Analisis kebutuhan tenaga kerja di perkebunan kopi pt. sulatco jaya abadi sulawesi selatan

Tanan, Aris (2006) Analisis kebutuhan tenaga kerja di perkebunan kopi pt. sulatco jaya abadi sulawesi selatan. Masters thesis, Institut Pertanian Bogor.

[img]
Preview
Text
R33-01-Tanan-Cover.pdf - Published Version

Download (407kB) | Preview
[img]
Preview
Text
R33-02-Tanan-Abstract.pdf - Published Version

Download (349kB) | Preview
[img]
Preview
Text
R33-03-Tanan-Ringkasaneksekutif.pdf - Published Version

Download (372kB) | Preview
[img]
Preview
Text
R33-05-Tanan-Pendahuluan.pdf - Published Version

Download (374kB) | Preview
[img]
Preview
Text
R33-04-Tanan-Daftarisi.pdf - Published Version

Download (380kB) | Preview

Abstract

The research was aimed to analyze man power demand on each business unit, to analyze man power demand that meet with company operational requirement, and to make plan for man power allocation in PT. Sulotco Jaya Abadi for the next 5 years. The research is a case study and using descriptive methods, by means analyze existing man power availability, man power demand analysis, man power changing analysis, excess of deficit man power analysis. The results shows that: 1) employee is dominated by men, 20 – 40 years, low level education (under basic school), living at and around location, worked at the company for 8 years or more, and employment status as daily part time labor; 2) there is an excessive man power in seedling, replanting and harvesting unit, while the deficit man power is in maintain and post harvesting unit also for total demand; 3) prediction of employee turn over to others company is 6 persons per years on average, and for inside company is 3 persons per year. The conclusion are: 1) number of man power demand for the company during 2006 are 6 persons for seedling unit, 16 persons for replanting, 289 persons in maintaining, 119 persons for harvesting, and 34 persons in post harvesting, respectively; 2) total man power demand for 2006 – 2011 for the unit are 464 persons, 491 persons, 518 persons, 546 persons, 573 persons and 602 persons, respectively; 3) activities scheduling and man power allocation will minimize fluctuation and monthly number of man power demand.

Item Type: Thesis (Masters)
Uncontrolled Keywords: PT. Sulotco; Tenaga Kerja; Studi Kasus; Primer dan Sekunder; JTK, JTSK dan JSK/K; Sulawesi Selatan.
Subjects: Manajemen Sumber Daya Manusia
Depositing User: SB-IPB Library
Date Deposited: 30 Aug 2016 01:23
Last Modified: 30 Aug 2016 01:23
URI: http://repository.sb.ipb.ac.id/id/eprint/2584

Actions (login required)

View Item View Item