Optimasi struktur modal dan formulasi strategi pendanaan proyek jalan tol di indonesia

Berutu, Gibranius (2017) Optimasi struktur modal dan formulasi strategi pendanaan proyek jalan tol di indonesia. Masters thesis, Institut Pertanian Bogor.

[img]
Preview
Text
E51-01-Berutu-Cover.pdf - Published Version

Download (1MB) | Preview
[img]
Preview
Text
E51-02-Berutu-Ringkasan.pdf - Published Version

Download (1MB) | Preview
[img]
Preview
Text
E51-03-Berutu-Summary.pdf - Published Version

Download (1MB) | Preview
[img]
Preview
Text
E51-04-Berutu-Daftarisi.pdf - Published Version

Download (1MB) | Preview
[img]
Preview
Text
E51-05-Berutu-Pendahuluan.pdf - Published Version

Download (1MB) | Preview
[img] Text
Tesis full.pdf
Restricted to Registered users only

Download (2MB)
Official URL: http://lib.sb.ipb.ac.id/

Abstract

The connectivity and inefficiency in the transportation sector have impacted on the high costs of transportation and logistics in Indonesia. Government of Indonesia putting the reduction of logistics costs toward improving the country’s infrastructure through toll road development as one of actions plan. Not all of the toll road investment packages are attracting to investors, thus the government’s support and investment strategies are needed. In the staging development scheme, the minimum investment feasibility is not attainable when the construction is completed at once. Staged development divided road into segments and it should be an alternative to generate traffic demand for assign minimum viability threshold. Government own the authority to determine initial tariff and its adjustment, therefore, investors have no power to set the price. This research considered a toll road trace operating in West Java Province, Indonesia which was developing in staged development schedule since 2007. The first and second segment had been fully operating while the third segment will be constructed soon. This research aims to (1) analize optimal capital structure of the staged development toll road project; (2) determine efforts necessary to guarantee financing for toll road project. The output of this study would be a beneficial for investor arranging the project funding policy. Optimization analyis was done using “trial-error” method and Quantitative Strategic Planning Matrix (QSPM) taken as a tool for ranking finance strategies. Simulation output explained that optimum equity level for the third phase development was 24 percent using sindicated banks loan, while inflation assumption for revenue projection refer to PPJT, with no delay for project execution. IRR on equity stood at 18.26 percent, while IRR on project at 15.77 percent. Simulation output revealed that late start of construction schedule would escalate the investment cost and decrease viability of project. Financing strategy was classified into four dimension, there were demand, funding, construction and operational. Demand strategy and operational stategy were identified as the most attractive strategies for investor, since it were able to improve the certainity of return for long term investment. Synthesis between capital structure optimization and funding stategy was found that long tenor and low interest rate debt would increase project cash flow capacity to returned back the investment and profit maximization for equity holders. Caution must be placed by investor for reach agreement about inflation assumption in PPJT. If it is taken too high, overestimate of revenue projection will be occured, as if the project is financialy viable, but actually not.

Item Type: Thesis (Masters)
Uncontrolled Keywords: DER, kelayakan, strategi pendanaan, struktur modal optimal, proyek jalan tol, QSPM DER, feasibility, financing strategy, optimal capital structure, QSPM, toll road project
Subjects: Manajemen Keuangan
Depositing User: SB-IPB Library
Date Deposited: 26 Feb 2018 03:05
Last Modified: 26 Feb 2018 03:05
URI: http://repository.sb.ipb.ac.id/id/eprint/2999